TRAM 015
Jump to navigation
Jump to search
![]() | ||
---|---|---|
Tram 015 | ||
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | In service | |
Delivered | 23 August 2024 | |
Entered Service | ~23 December 2024 | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | Tram 015 |
²
⁴
Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
- It was transported from Santander, Spain aboard Höegh Trapper and arrived at Port Kembla on 10 August 2024.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.