TRAM 015: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (In service) |
Barry Drive (talk | contribs) (Add image) |
||
Line 1: | Line 1: | ||
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | {| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | ||
! colspan="3" align=center | | ! colspan="3" align=center | [[File:T015.jpg|link=]] | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 015</big> | ! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 015</big> | ||
Line 26: | Line 26: | ||
|- | |- | ||
| valign=top | '''Gallery Album''' | | valign=top | '''Gallery Album''' | ||
| | | [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-015 Tram 015] | ||
|} | |} | ||
[[TRAM 014|<< prev]] | [[TRAM 016|next >>]] | [[TRAM 014|<< prev]] | [[TRAM 016|next >>]] |
Latest revision as of 23:14, 20 March 2025
![]() | ||
---|---|---|
Tram 015 | ||
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | In service | |
Delivered | 23 August 2024 | |
Entered Service | ~23 December 2024 | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | Tram 015 |
²
⁴
Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
- It was transported from Santander, Spain aboard Höegh Trapper and arrived at Port Kembla on 10 August 2024.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.