TRAM 015: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 12: Line 12:
|-
|-
| '''Status'''
| '''Status'''
| --
| In transit
|-
|-
| '''Delivered'''
| '''Delivered'''
Line 35: Line 35:
[[File:Bike.jpg|25px|link=]]⁴
[[File:Bike.jpg|25px|link=]]⁴


Tram 015 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024.
Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram.


==Notes==
==Notes==
* Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
<!-- * Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line. -->
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
<!-- * It is being transported from Santander, Spain aboard ''Höegh London'' and is due to arrive at Port Kembla on 30 June 2024. ## uncertain whether 015 or 016 was on board ''London'' ##
* It is being transported from Santander, Spain aboard ''Höegh Trapper'' and is due to arrive at Port Kembla apx 10 August 2024. <!-- ## uncertain whether 015 or 016 was on board ''London'' ##
  -->
  -->


[[Category:CAF Urbos 100]]
[[Category:CAF Urbos 100]]
[[Category:Expected Trams]]
[[Category:Expected Trams]]

Revision as of 18:43, 23 July 2024

Tram 015
Chassis CAF Urbos 100
Depot --
Status In transit
Delivered --
Entered Service --
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.

Notes

  • It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
  • It is being transported from Santander, Spain aboard Höegh Trapper and is due to arrive at Port Kembla apx 10 August 2024.