TRAM 015: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) m (Text replacement - "25px|link=↵" to "") |
Barry Drive (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| | | In transit | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
Line 21: | Line 21: | ||
|- | |- | ||
| valign=top | '''Build Date''' | | valign=top | '''Build Date''' | ||
| | | 2024 | ||
|- | |- | ||
| valign=top | '''Capacity''' | | valign=top | '''Capacity''' | ||
Line 39: | Line 39: | ||
==Notes== | ==Notes== | ||
* Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line. | * Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line. | ||
* It | * It is fitted with on-board batteries, enabling it to operate wire-free for short distances. | ||
* It is being transported from Santander, Spain aboard ''Höegh London'' and is due to arrive at Port Kembla on 30 June 2024. | |||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category:Expected Trams]] | [[Category:Expected Trams]] |
Revision as of 19:27, 30 May 2024
Tram 015 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | -- | |
Status | In transit | |
Delivered | -- | |
Entered Service | -- | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
² ⁴
Tram 015 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024.
Notes
- Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
- It is being transported from Santander, Spain aboard Höegh London and is due to arrive at Port Kembla on 30 June 2024.