TRAM 015: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
No edit summary
(Delivered (tbc))
 
Line 1: Line 1:
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
! colspan="3" align=center | <!-- insert photo here [[File:T0--.jpg]] -->
! colspan="3" align=center | <!-- insert photo here [[File:T015.jpg]] -->
|-
|-
! colspan="3" align=center bgcolor=#CCCCFF| Tram 015
! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 015</big>
|-
|-
| valign=top | '''Chassis'''
| valign=top | '''Chassis'''
Line 8: Line 8:
|-
|-
| valign=top | '''Depot'''  
| valign=top | '''Depot'''  
<!-- | [[:Category:Mitchell Tram Depot|Mitchell]] -->
| [[:Category:Mitchell Tram Depot|Mitchell]]  
| --
|-
|-
| '''Status'''
| '''Status'''
| In transit
| Not in service
|-
|-
| '''Delivered'''
| '''Delivered'''
| --
| 23 August 2024
|-
|-
| '''Entered Service'''
| '''Entered Service'''
Line 35: Line 34:
[[File:Bike.jpg|25px|link=]]⁴
[[File:Bike.jpg|25px|link=]]⁴


Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram.
Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.


==Notes==
==Notes==
<!-- * Tram 015 will be the first of five new trams ordered for Stage 2A of the Canberra Light Rail line. -->
* Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
* It was transported from Santander, Spain aboard ''Höegh Trapper'' and arrived at Port Kembla on 10 August 2024.  
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances.
* It is being transported from Santander, Spain aboard ''Höegh Trapper'' and is due to arrive at Port Kembla apx 10 August 2024. <!-- ## uncertain whether 015 or 016 was on board ''London'' ##
-->


[[Category:CAF Urbos 100]]
[[Category:CAF Urbos 100]]
[[Category:Expected Trams]]
[[Category:Mitchell Tram Depot]]
[[Category:Delivered August 2024]]

Latest revision as of 17:16, 22 August 2024

Tram 015
Chassis CAF Urbos 100
Depot Mitchell
Status Not in service
Delivered 23 August 2024
Entered Service --
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album --

<< prev | next >>

²

Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.

Notes

  • Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
  • It was transported from Santander, Spain aboard Höegh Trapper and arrived at Port Kembla on 10 August 2024.
  • It is fitted with on-board batteries, enabling it to operate wire-free for short distances.