TRAM 015: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
(In service)
(Add image)
 
Line 1: Line 1:
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;"
! colspan="3" align=center | <!-- insert photo here [[File:T015.jpg]] -->
! colspan="3" align=center | [[File:T015.jpg|link=]]
|-
|-
! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 015</big>
! colspan="3" align=center bgcolor=#CCCCFF| <big>Tram 015</big>
Line 26: Line 26:
|-
|-
| valign=top | '''Gallery Album'''
| valign=top | '''Gallery Album'''
| -- <!--  [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-015 Tram 015] -->
| [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-015 Tram 015]
|}
|}
[[TRAM 014|<< prev]] | [[TRAM 016|next >>]]
[[TRAM 014|<< prev]] | [[TRAM 016|next >>]]

Latest revision as of 23:14, 20 March 2025

Tram 015
Chassis CAF Urbos 100
Depot Mitchell
Status In service
Delivered 23 August 2024
Entered Service ~23 December 2024
Build Date 2024
Capacity 66 seated, 207 total
Gallery Album Tram 015

<< prev | next >>

²

Tram 015 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.

Notes

  • Although Tram 015 is numerically the first of five new trams ordered for Stage 2A of the Canberra Light Rail line, Tram 017 was the first to be delivered.
  • It was transported from Santander, Spain aboard Höegh Trapper and arrived at Port Kembla on 10 August 2024.
  • It is fitted with on-board batteries, enabling it to operate wire-free for short distances.