TRAM 019

From ACT Bus Fleetwiki
Revision as of 16:18, 25 May 2024 by Barry Drive (talk | contribs) (Text replacement - "25px|link=↵" to "")
Jump to navigation Jump to search
Tram 019
Chassis CAF Urbos 100
Depot --
Status Ordered
Delivered --
Entered Service --
Build Date --
Capacity 66 seated, 207 total
Gallery Album --

<< prev |

²

Tram 019 will be a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is expected to be delivered in 2024/25.

Notes

  • Tram 019 will be the last of five new trams ordered for Stage 2A of the Canberra Light Rail line.
  • It will be fitted with on-board batteries, enabling it to operate wire-free for short distances.