TRAM 017: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) mNo edit summary |
Barry Drive (talk | contribs) (In service) |
||
Line 11: | Line 11: | ||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| | | In service | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
Line 17: | Line 17: | ||
|- | |- | ||
| '''Entered Service''' | | '''Entered Service''' | ||
| | | 28 November 2024 | ||
|- | |- | ||
| valign=top | '''Build Date''' | | valign=top | '''Build Date''' | ||
Line 34: | Line 34: | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram | Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | ||
==Notes== | ==Notes== | ||
Line 43: | Line 43: | ||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category:Mitchell Tram Depot]] | [[Category:Mitchell Tram Depot]] | ||
[[Category:Canberra Metro Trams]] | |||
[[Category:Delivered July 2024]] | [[Category:Delivered July 2024]] |
Revision as of 12:50, 27 November 2024
Tram 017 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | In service | |
Delivered | 26 July 2024 | |
Entered Service | 28 November 2024 | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
² ⁴
Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- Tram 017 was transported from Santander, Spain aboard Höegh Trotter and arrived at Port Kembla on 22 July 2024.
- Tram 017 is the first of five CAF Urbos 100 trams to be delivered for Stage 2A of the Canberra Light Rail.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.