TRAM 018: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (Pre-delivery) |
Barry Drive (talk | contribs) (Expected delivery) |
||
Line 12: | Line 12: | ||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| | | Not in service | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
| | | 30 August 2024 | ||
|- | |- | ||
| '''Entered Service''' | | '''Entered Service''' | ||
Line 35: | Line 35: | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
Tram 018 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram, which is | Tram 018 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service. | ||
==Notes== | ==Notes== | ||
Line 42: | Line 42: | ||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category: | [[Category:Mitchell Tram Depot]] | ||
[[Category:Delivered August 2024]] |
Latest revision as of 04:06, 29 August 2024
Tram 018 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | -- |
Status | Not in service | |
Delivered | 30 August 2024 | |
Entered Service | -- | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
² ⁴
Tram 018 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.
Notes
- Tram 018 was transported from Santander, Spain aboard Höegh Shanghai and arrived at Port Kembla on 26 August 2024.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.