TRAM 017: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (In transit) |
Barry Drive (talk | contribs) No edit summary |
||
Line 8: | Line 8: | ||
|- | |- | ||
| valign=top | '''Depot''' | | valign=top | '''Depot''' | ||
| [[:Category:Mitchell Tram Depot|Mitchell]] | |||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| | | Not in service | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
| | | 25 July 2024 | ||
|- | |- | ||
| '''Entered Service''' | | '''Entered Service''' | ||
Line 35: | Line 34: | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
Tram 017 | Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service. | ||
==Notes== | ==Notes== | ||
* Tram 017 was transported from Santander, Spain aboard ''Höegh Trotter'' and arrived at Port Kembla on 22 July 2024. | |||
* Tram 017 | * Tram 017 is the first of five CAF Urbos 100 trams to be delivered for Stage 2A of the Canberra Light Rail. | ||
* It is fitted with on-board batteries, enabling it to operate wire-free for short distances. | |||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category: | [[Category:Mitchell Tram Depot]] | ||
<!-- [[Category:Canberra Metro Trams]] --> | |||
[[Category:Delivered July 2024]] |
Revision as of 16:04, 24 July 2024
Tram 017 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | Not in service | |
Delivered | 25 July 2024 | |
Entered Service | -- | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
² ⁴
Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.
Notes
- Tram 017 was transported from Santander, Spain aboard Höegh Trotter and arrived at Port Kembla on 22 July 2024.
- Tram 017 is the first of five CAF Urbos 100 trams to be delivered for Stage 2A of the Canberra Light Rail.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.