TRAM 003: Difference between revisions

From ACT Bus Fleetwiki
Jump to navigation Jump to search
No edit summary
(New AOA)
Line 37: Line 37:
[[File:Wifi.jpg|25px|link=]]
[[File:Wifi.jpg|25px|link=]]
[[File:Bike.jpg|25px|link=]]⁴
[[File:Bike.jpg|25px|link=]]⁴
[[File:AOA.png|link=:Category:Current AOA Trams]]


Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram.
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for '''"Built for CBR" (ACT Government)'''.  


==Notes==
==Notes==
Line 49: Line 50:
* [[File:Photo.png|link=]] '''Canberra Institute of Technology''' – ''24 May 2021 to 13 November 2021''
* [[File:Photo.png|link=]] '''Canberra Institute of Technology''' – ''24 May 2021 to 13 November 2021''


<!-- * [[File:Photo.png|link=]] '''"Built for CBR" (ACT Government)''' – ''4 May 2024 to current''
* <!-- [[File:Photo.png|link=]]-->'''"Built for CBR" (ACT Government)''' – ''4 May 2024 to current''
-->
 
[[Category:Canberra Metro Trams]]
[[Category:Canberra Metro Trams]]
[[Category:CAF Urbos 100]]
[[Category:CAF Urbos 100]]
[[Category:Mitchell Tram Depot]]  
[[Category:Mitchell Tram Depot]]  
[[Category:Delivered May 2018]]
[[Category:Delivered May 2018]]
[[Category:Former AOA Trams]]
[[Category:Current AOA Trams]]

Revision as of 17:54, 5 May 2024

Tram 003
Chassis CAF Urbos 100
Depot Mitchell
Status In service
Delivered 4 May 2018
Entered Service 20 April 2019
Build Date Feb 2018
Capacity 66 seated, 207 total
Gallery Album Tram 003

<< prev | next >>

²

Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for "Built for CBR" (ACT Government).

Notes

  • It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018.
  • It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av.
  • On Saturday 12 November 2022 at around 7:45am, Tram 003 collided with a car at the Hinder St intersection.

All Over Advertising

  • Canberra Institute of Technology24 May 2021 to 13 November 2021
  • "Built for CBR" (ACT Government)4 May 2024 to current