TRAM 001: Difference between revisions
Jump to navigation
Jump to search
(AOA) |
Barry Drive (talk | contribs) (AOA reformat) |
||
Line 21: | Line 21: | ||
| '''Entered Service''' | | '''Entered Service''' | ||
| 20 April 2019 | | 20 April 2019 | ||
|- | <!-- |- | ||
| valign-top | '''Serial Number''' | | valign-top | '''Serial Number''' | ||
| -- | | -- --> | ||
|- | |- | ||
| valign=top | '''Capacity''' | | valign=top | '''Capacity''' | ||
Line 37: | Line 37: | ||
[[File:Wifi.jpg|25px|link=]] | [[File:Wifi.jpg|25px|link=]] | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
[[File:AOA.png|25px|link=:Category:Current AOA Trams]] | |||
Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for '''Check in CBR (ACT Health)'''. | |||
Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | |||
==Notes== | ==Notes== | ||
Line 50: | Line 50: | ||
==All Over Advertising== | ==All Over Advertising== | ||
[[File:NoPhoto.jpg|link=]] '''Check in CBR (ACT Health)''' – ''3 May 2021 to current'' | |||
==Media== | ==Media== | ||
[[File:video.png|link=]] [https://youtu.be/Dgizr98K7z8 Canberra's Light Rail Vehicle Journey (1:28)] – YouTube <br> | |||
[[File:video.png]] [https://youtu.be/YJ_WaOFdG3I Canberra's First Light Rail Vehicle Arrives (1:17)] – YouTube | |||
[[Category:Canberra Metro Trams]] | [[Category:Canberra Metro Trams]] |
Revision as of 16:20, 3 May 2021
Tram 001 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | In service | |
Build Date | Nov 2017 | |
Delivered | 13 December 2017 | |
Entered Service | 20 April 2019 | |
Capacity | 66 seated, 207 total | |
Gallery Album | Tram 001 |
| next >>
Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for Check in CBR (ACT Health).
Notes
- Tram 001 is the first of 14 Urbos 100 trams to be delivered for Stage 1 of Canberra Light Rail.
- It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Berlin arriving on 12 December 2017.
- On Saturday 9 March 2019, while performing testing, Tram 001 struck a pedestrian who was crossing Northbourne Ave.
All Over Advertising
Check in CBR (ACT Health) – 3 May 2021 to current
Media
Canberra's Light Rail Vehicle Journey (1:28) – YouTube
Canberra's First Light Rail Vehicle Arrives (1:17) – YouTube