TRAM 017: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) No edit summary |
Barry Drive (talk | contribs) mNo edit summary |
||
Line 14: | Line 14: | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
| | | 26 July 2024 | ||
|- | |- | ||
| '''Entered Service''' | | '''Entered Service''' |
Revision as of 14:58, 25 July 2024
Tram 017 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | Not in service | |
Delivered | 26 July 2024 | |
Entered Service | -- | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
² ⁴
Tram 017 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.
Notes
- Tram 017 was transported from Santander, Spain aboard Höegh Trotter and arrived at Port Kembla on 22 July 2024.
- Tram 017 is the first of five CAF Urbos 100 trams to be delivered for Stage 2A of the Canberra Light Rail.
- It is fitted with on-board batteries, enabling it to operate wire-free for short distances.