TRAM 001: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (AOA reformat) |
Barry Drive (talk | contribs) (Add image) |
||
Line 1: | Line 1: | ||
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | {| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | ||
! colspan="3" align=center |[[File:T001.jpg]] | ! colspan="3" align=center |[[File:T001-AOA.jpg|link=]] | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| Tram 001 | ! colspan="3" align=center bgcolor=#CCCCFF| Tram 001 | ||
Line 50: | Line 50: | ||
==All Over Advertising== | ==All Over Advertising== | ||
[[File: | [[File:Photo.png|link=]] '''Check in CBR (ACT Health)''' – ''3 May 2021 to current'' | ||
==Media== | ==Media== | ||
[[File:video.png|link=]] [https://youtu.be/Dgizr98K7z8 Canberra's Light Rail Vehicle Journey (1:28)] – YouTube <br> | [[File:video.png|link=]] [https://youtu.be/Dgizr98K7z8 Canberra's Light Rail Vehicle Journey (1:28)] – YouTube <br> | ||
[[File:video.png]] [https://youtu.be/YJ_WaOFdG3I Canberra's First Light Rail Vehicle Arrives (1:17)] – YouTube | [[File:video.png|link=]] [https://youtu.be/YJ_WaOFdG3I Canberra's First Light Rail Vehicle Arrives (1:17)] – YouTube | ||
[[Category:Canberra Metro Trams]] | [[Category:Canberra Metro Trams]] |
Revision as of 20:06, 15 May 2021
File:T001-AOA.jpg | ||
---|---|---|
Tram 001 | ||
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | In service | |
Build Date | Nov 2017 | |
Delivered | 13 December 2017 | |
Entered Service | 20 April 2019 | |
Capacity | 66 seated, 207 total | |
Gallery Album | Tram 001 |
| next >>
Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram. It is currently in an all over advertising wrap for Check in CBR (ACT Health).
Notes
- Tram 001 is the first of 14 Urbos 100 trams to be delivered for Stage 1 of Canberra Light Rail.
- It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Berlin arriving on 12 December 2017.
- On Saturday 9 March 2019, while performing testing, Tram 001 struck a pedestrian who was crossing Northbourne Ave.
All Over Advertising
Check in CBR (ACT Health) – 3 May 2021 to current
Media
Canberra's Light Rail Vehicle Journey (1:28) – YouTube
Canberra's First Light Rail Vehicle Arrives (1:17) – YouTube