TRAM 003: Difference between revisions
Jump to navigation
Jump to search
en>Barry m (Text replacement - "25px|link= [4] 25px|link= [2] 25px|link= <!-- 25px|link= -->" to "25px|link=² 25px|link= 25px|link= 25px|link=⁴ ") |
Barry Drive (talk | contribs) (AOA removed L) |
||
(13 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | {| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | ||
! colspan="3" align=center |[[File:T003.jpg]] | ! colspan="3" align=center |[[File:T003-AOA.jpg|link=]] | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| Tram 003 | ! colspan="3" align=center bgcolor=#CCCCFF| Tram 003 | ||
Line 18: | Line 18: | ||
| valign=top | '''Entered Service''' | | valign=top | '''Entered Service''' | ||
| 20 April 2019 | | 20 April 2019 | ||
|- | <!-- |- | ||
| valign-top | '''Serial Number''' | | valign-top | '''Serial Number''' | ||
| -- | | -- --> | ||
|- | |- | ||
| valign=top | '''Build Date''' | | valign=top | '''Build Date''' | ||
Line 29: | Line 29: | ||
|- | |- | ||
| valign=top | '''Gallery Album''' | | valign=top | '''Gallery Album''' | ||
| [http://www.actbus.net/gallery/ | | [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-003 Tram 003] | ||
|} | |} | ||
[[TRAM 002|<< prev]] | [[TRAM 004|next >>]] | [[TRAM 002|<< prev]] | [[TRAM 004|next >>]] | ||
Line 35: | Line 35: | ||
[[File:WC.jpg|25px|link=]]² | [[File:WC.jpg|25px|link=]]² | ||
[[File:CC.jpg|25px|link=]] | [[File:CC.jpg|25px|link=]] | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
<!-- [[File:AOA.png|link=:Category:Current AOA Trams]] --> | |||
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | ||
<!-- It is currently in an all over advertising wrap for '''University of New South Wales'''. --> | |||
==Notes== | ==Notes== | ||
* It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018. | * It was transported from Santander, Spain to Port Kembla, NSW on board ''Höegh Target'' arriving on 30 April 2018. | ||
* It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av. | * It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av. | ||
* On Saturday 12 November 2022 at around 7:45am, Tram 003 collided with a car at the Hinder St intersection. | |||
** [http://www.onsceneact.com.au/index.php/511-car-and-light-rail-vehicle-collide-in-gungahlin On Scene ACT] | |||
==All Over Advertising== | |||
* [[File:Photo.png|link=]] '''Canberra Institute of Technology''' – ''24 May 2021 to 13 November 2021'' | |||
* [[File:Photo.png|link=]] '''"Built for CBR" (ACT Government)''' – ''4 May 2024 to June 2024'' | |||
* [[File:Photo.png|link=]] '''University of New South Wales''' – ''September 2024 to November 2024'' | |||
[[Category:Canberra Metro Trams]] | [[Category:Canberra Metro Trams]] | ||
Line 49: | Line 58: | ||
[[Category:Mitchell Tram Depot]] | [[Category:Mitchell Tram Depot]] | ||
[[Category:Delivered May 2018]] | [[Category:Delivered May 2018]] | ||
[[Category:Former AOA Trams]] |
Latest revision as of 21:22, 20 November 2024
Tram 003 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | In service | |
Delivered | 4 May 2018 | |
Entered Service | 20 April 2019 | |
Build Date | Feb 2018 | |
Capacity | 66 seated, 207 total | |
Gallery Album | Tram 003 |
² ⁴
Tram 003 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Target arriving on 30 April 2018.
- It was the first tram to be tested on the track, being towed from the depot on 11 June 2018 to Flemington Road between Kate Crace St and Manning Clark Av.
- On Saturday 12 November 2022 at around 7:45am, Tram 003 collided with a car at the Hinder St intersection.
All Over Advertising
- Canberra Institute of Technology – 24 May 2021 to 13 November 2021
- "Built for CBR" (ACT Government) – 4 May 2024 to June 2024
- University of New South Wales – September 2024 to November 2024