TRAM 001: Difference between revisions
Jump to navigation
Jump to search
en>Barry m (Text replacement - "25px|link= [4] 25px|link= [2] 25px|link= <!-- 25px|link= -->" to "25px|link=² 25px|link= 25px|link= 25px|link=⁴ ") |
Barry Drive (talk | contribs) m (Text replacement - "25px|link=↵" to "") |
||
(10 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | {| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | ||
! colspan="3" align=center |[[File:T001.jpg]] | ! colspan="3" align=center |[[File:T001.jpg|link=]] | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| Tram 001 | ! colspan="3" align=center bgcolor=#CCCCFF| Tram 001 | ||
Line 21: | Line 21: | ||
| '''Entered Service''' | | '''Entered Service''' | ||
| 20 April 2019 | | 20 April 2019 | ||
|- | <!-- |- | ||
| valign-top | '''Serial Number''' | | valign-top | '''Serial Number''' | ||
| -- | | -- --> | ||
|- | |- | ||
| valign=top | '''Capacity''' | | valign=top | '''Capacity''' | ||
Line 29: | Line 29: | ||
|- | |- | ||
| valign=top | '''Gallery Album''' | | valign=top | '''Gallery Album''' | ||
| [http://www.actbus.net/gallery/ | | [http://www.actbus.net/gallery-canberra-metro/nggallery/trams/Tram-001 Tram 001] | ||
|} | |} | ||
| [[TRAM 002|next >>]] | | [[TRAM 002|next >>]] | ||
Line 35: | Line 35: | ||
[[File:WC.jpg|25px|link=]]² | [[File:WC.jpg|25px|link=]]² | ||
[[File:CC.jpg|25px|link=]] | [[File:CC.jpg|25px|link=]] | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram. | ||
==Notes== | ==Notes== | ||
* Tram 001 | * Tram 001 was the first of 14 Urbos 100 trams to be delivered for Stage 1 of Canberra Light Rail. | ||
* It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Berlin arriving on 12 December 2017. | * It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Berlin arriving on 12 December 2017. | ||
* On Saturday 9 March 2019, while performing testing, Tram 001 struck a pedestrian who was crossing Northbourne Ave. | * On Saturday 9 March 2019, while performing testing, Tram 001 struck a pedestrian who was crossing Northbourne Ave. | ||
** [https://citynews.com.au/2019/canberra-first-man-struck-by-tram/ City News] | ** [https://citynews.com.au/2019/canberra-first-man-struck-by-tram/ City News] | ||
** [https://www.canberratimes.com.au/national/act/man-hit-by-canberra-tram-while-walking-through-intersection-20190309-p512ww.html The Canberra Times] | ** [https://www.canberratimes.com.au/national/act/man-hit-by-canberra-tram-while-walking-through-intersection-20190309-p512ww.html The Canberra Times ($)] | ||
** [https://www.abc.net.au/news/2019-03-09/man-struck-by-light-rail-vehicle-in-central-canberra/10886274 ABC News] | ** [https://www.abc.net.au/news/2019-03-09/man-struck-by-light-rail-vehicle-in-central-canberra/10886274 ABC News] | ||
* On Friday 24 June 2022 at around 7:30am, a pedestrian was seriously injured when he walked into the path of Tram 001 - this occurred near the Ipima St stop. | |||
** [https://www.canberratimes.com.au/story/7793311/man-suffers-massive-head-trauma-after-being-hit-by-morning-tram/ The Canberra Times ($)] | |||
==All Over Advertising== | |||
[[File:Photo.png|link=]] '''Check in CBR (ACT Health)''' – ''3 May 2021 to 4 February 2022'' | |||
[[File:Photo.png|link=]] '''Floriade 2022''' – ''18 August 2022 to 17 October 2022'' | |||
==Media== | ==Media== | ||
[[File:video.png|link=]] [https://youtu.be/Dgizr98K7z8 Canberra's Light Rail Vehicle Journey (1:28)] – YouTube <br> | |||
[[File:video.png|link=]] [https://youtu.be/YJ_WaOFdG3I Canberra's First Light Rail Vehicle Arrives (1:17)] – YouTube | |||
[[Category:Canberra Metro Trams]] | [[Category:Canberra Metro Trams]] | ||
Line 59: | Line 65: | ||
[[Category:Delivered December 2017]] | [[Category:Delivered December 2017]] | ||
[[Category:YouTube]] | [[Category:YouTube]] | ||
[[Category:Former AOA Trams]] |
Latest revision as of 15:17, 25 May 2024
Tram 001 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell | |
Status | In service | |
Build Date | Nov 2017 | |
Delivered | 13 December 2017 | |
Entered Service | 20 April 2019 | |
Capacity | 66 seated, 207 total | |
Gallery Album | Tram 001 |
| next >>
² ⁴
Tram 001 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram.
Notes
- Tram 001 was the first of 14 Urbos 100 trams to be delivered for Stage 1 of Canberra Light Rail.
- It was transported from Santander, Spain to Port Kembla, NSW on board Höegh Berlin arriving on 12 December 2017.
- On Saturday 9 March 2019, while performing testing, Tram 001 struck a pedestrian who was crossing Northbourne Ave.
- On Friday 24 June 2022 at around 7:30am, a pedestrian was seriously injured when he walked into the path of Tram 001 - this occurred near the Ipima St stop.
All Over Advertising
Check in CBR (ACT Health) – 3 May 2021 to 4 February 2022
Floriade 2022 – 18 August 2022 to 17 October 2022
Media
Canberra's Light Rail Vehicle Journey (1:28) – YouTube
Canberra's First Light Rail Vehicle Arrives (1:17) – YouTube