TRAM 019: Difference between revisions
Jump to navigation
Jump to search
Barry Drive (talk | contribs) (New) |
Barry Drive (talk | contribs) (Delivery expected) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | {| align=right cellpadding=2 class="toccolours" style="margin:10px; padding:5px; z-index: 1; width=62px;" | ||
! colspan="3" align=center | <!-- insert photo here [[File: | ! colspan="3" align=center | <!-- insert photo here [[File:T019.jpg]] --> | ||
|- | |- | ||
! colspan="3" align=center bgcolor=#CCCCFF| Tram 019 | ! colspan="3" align=center bgcolor=#CCCCFF| Tram 019 | ||
Line 8: | Line 8: | ||
|- | |- | ||
| valign=top | '''Depot''' | | valign=top | '''Depot''' | ||
| [[:Category:Mitchell Tram Depot|Mitchell]] - | |||
|- | |- | ||
| '''Status''' | | '''Status''' | ||
| | | Not in service | ||
|- | |- | ||
| '''Delivered''' | | '''Delivered''' | ||
| | | 17 October 2024 | ||
|- | |- | ||
| '''Entered Service''' | | '''Entered Service''' | ||
Line 21: | Line 20: | ||
|- | |- | ||
| valign=top | '''Build Date''' | | valign=top | '''Build Date''' | ||
| | | 2024 | ||
|- | |- | ||
| valign=top | '''Capacity''' | | valign=top | '''Capacity''' | ||
Line 33: | Line 32: | ||
[[File:WC.jpg|25px|link=]]² | [[File:WC.jpg|25px|link=]]² | ||
[[File:CC.jpg|25px|link=]] | [[File:CC.jpg|25px|link=]] | ||
[[File:Bike.jpg|25px|link=]]⁴ | [[File:Bike.jpg|25px|link=]]⁴ | ||
Tram 019 | Tram 019 is a Construcciones y Auxiliar de Ferrocarriles (CAF) '''Urbos 100''' (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service. | ||
==Notes== | ==Notes== | ||
* Tram 019 will be the last of five new trams ordered for Stage 2A of the Canberra Light Rail line. | <!-- * Tram 019 will be the last of five new trams ordered for Stage 2A of the Canberra Light Rail line. | ||
* | * Tram 019 was transported from Santander, Spain aboard Höegh (???) and arrived at Port Kembla on (???) 2024. --> | ||
* Tram 019 is fitted with on-board batteries, enabling it to operate wire-free for short distances. | |||
[[Category:CAF Urbos 100]] | [[Category:CAF Urbos 100]] | ||
[[Category: | [[Category:Mitchell Tram Depot]] | ||
[[Category:Delivered October 2024]] |
Latest revision as of 05:17, 16 October 2024
Tram 019 | ||
---|---|---|
Chassis | CAF Urbos 100 | |
Depot | Mitchell - | |
Status | Not in service | |
Delivered | 17 October 2024 | |
Entered Service | -- | |
Build Date | 2024 | |
Capacity | 66 seated, 207 total | |
Gallery Album | -- |
<< prev |
² ⁴
Tram 019 is a Construcciones y Auxiliar de Ferrocarriles (CAF) Urbos 100 (3rd Generation) five-module 100% low floor bidirectional tram, which is not yet in service.
Notes
- Tram 019 is fitted with on-board batteries, enabling it to operate wire-free for short distances.